Skip to content
SECTION 01 / QUALITY DOCUMENTATION

Every certificate on this page has a renewal date.
Every claim has a source.

ProEdge Wire's quality system is not a marketing badge wall. It is a living, audited document set — current registrations, recent renewals, third-party verification, and the per-shipment paperwork that follows every spool out the door. The dates below are real. The scope footnote below is candid. If a procurement or QA reviewer needs a document that isn't listed, the answer is on this page before you ask for it.

ISO 9001:2015 QUALITY MANAGEMENT
CURRENT · FEB 2025
AS9100D AEROSPACE REGISTER
CURRENT · FEB 2025
99.4% ON-TIME SHIPMENT RATE
18-MO TRAILING · Q1 2025 AUDIT
5 OF 5 SHIPMENT DOCUMENTS
C OF C · PPAP · IMDS · DIM · TRAC
Stacked certification binders and audit documents photographed on a brushed steel workbench.
Audit binder set, Q1 2025 — photographed on the QA floor at the Cleveland facility.
SECTION 02 / REGISTRATIONS & AUDITS

Certifications Matrix

Four active registrations, each with a named issuing body and a documented renewal date. Hover any row for scope details; download buttons route to the current PDF on file.

CERTIFICATION ISSUING BODY SCOPE RENEWAL STATUS
ISO 9001:2015 Quality Management System ANSI National Accreditation Board (ANAB) — via accredited registrar Design, drawing, and manufacture of specialty wire and stranded cable products at both Cleveland production facilities. FEB 2025 CURRENT
AS9100D Aerospace Quality Management Same accredited registrar, aerospace scheme Manufacture of precision-drawn wire and specialty alloy conductors for aerospace, defense, and aviation supply chains, including ITAR-registered customer programs. FEB 2025 CURRENT
RoHS EU Directive 2011/65/EU In-house compliance program, third-party tested Restriction of Hazardous Substances compliance maintained across all stocked alloy families; full material declaration reports available on request per shipment. FEB 2025 CURRENT
3PL-AUDIT On-Time Shipment Verification Global Logistics Review (independent third party) Independent audit of trailing 18-month shipment performance against committed ship dates. Result: 99.4% on-time across 4.2M lbs shipped in 2024. Q1 2025 VERIFIED
SECTION 03 / PER-SHIPMENT PAPERWORK

What lands in your inbox with every spool

Five standard documents accompany every ProEdge Wire shipment. The package is generated against your PO, not against a generic template — alloy heat numbers, dimensional readings, and PPAP elements reference your part, your lot, and your spec.

  1. 01 Certificate of Conformance (C of C) Generated against the order line at pack-out. Lists part number, alloy heat number, lot quantity, finish, and a statement of conformance to your purchase specification. Signed by the shift supervisor on duty. PACK-OUT
  2. 02 PPAP Package Production Part Approval Process documentation delivered to the level your program requires — from Level 1 (warranty only) through Level 5 (full dimensional, material, and capability studies). Standard for new automotive and aerospace releases. FIRST ARTICLE / NEW REVISION
  3. 03 IMDS Submission International Material Data System entries for automotive customers. Material composition, restricted-substance declarations, and recyclability classifications submitted against your IMDS recipient ID on first article. FIRST ARTICLE / ANNUAL REFRESH
  4. 04 Dimensional Inspection Report Sample-based readings against your specified features — diameter, ovality, tensile, elongation, and resistivity where applicable. Available as raw data or signed PDF on every lot, no extra charge. EVERY LOT
  5. 05 Material Traceability Full chain of custody from incoming alloy heat number through draw, anneal, and plating operations. Records retained for seven years and available to qualified customers on request. ON REQUEST · 7-YEAR RETENTION

Need a documentation package scoped to a specific program — a defense DD250 flow, a medical device file, or a Tier 1 automotive release? Send your spec and we'll return a documented package list before the RFQ is quoted.

Request a Quote

Q1 2025 · Global Logistics Review

Third-party audited, not self-reported.

Our on-time delivery rate, shipment volume, and non-conformance record were independently measured across an 18-month trailing window ending March 2025. These four numbers come from that audit — they are not marketing copy.

  1. 99.4%

    On-time shipment rate

    Trailing 18 months · verified by Global Logistics Review

  2. 4.2M lbs

    Finished wire shipped, 2024

    +19% year-over-year across 1,800+ active SKUs

  3. 0

    Critical non-conformances

    Recorded across the audited 18-month window

  4. 18mo

    Audit window

    Q3 2023 — Q1 2025 · full report available on request

Audit document reference: GLR-2025-0317-PEW · released March 2025

Scope of Compliance

Here is what we don't claim, because we know you'll verify.

ProEdge Wire holds the certifications listed below, renewed in February 2025. We do not claim — and have never claimed — coverage we don't have. If your program requires a certification outside this scope, we will tell you before the RFQ is reviewed, not after.

Held · Current

  • ISO 9001:2015Quality management system · renewed Feb 2025
  • AS9100DAerospace quality management · renewed Feb 2025
  • RoHSRestriction of Hazardous Substances compliance
  • PPAPProduction Part Approval Process documentation on request
  • IMDSInternational Material Data System entries on request
  • C of CCertificate of Conformance issued with every shipment

Not Held · Out of Scope

  • NADCAPWe do not hold Nadcap accreditation for special processes.
  • ISO 13485We are not certified to the medical-device quality standard.
  • Tungsten carbide wireOutside our 47 stocked alloy families.
  • Fiber opticOutside our conductor manufacturing scope.
  • Lead time < 5 daysOur published rush floor is 5 business days for qualified customers.

If a certification is mission-critical to your application, contact [email protected] with the standard reference number — our applications engineering group will confirm coverage before you commit a drawing.

Request for Quote

Send the drawing. We'll send a metallurgist-reviewed quote — typically within one business day.

Every RFQ is reviewed by an in-house metallurgist and an applications engineer before it becomes a quote. We respond in hours, not days, because the early engineering decisions are the ones that compound across the program.

No spam, no marketing list. Drawings are handled under your standard NDA; ITAR-flagged submissions are routed to the defense cell.